Construction of a water supply system at Balibo CLC in Timor-Leste was commenced on 9 August, and was completed in 17 August 2025.
The project was funded in the main by the Balibo House Trust. Brian Boon, an engineer from the charity MiVAC, was the project supervisor. Labourers were hired locally in Balibo – in numbers as and when required.
A brief pictorial report on the construction of the water supply system is available below.
BALIBO CLC SH SYSTEM CONSTRUCTION REPORT